Session Description: You are on your way out of the facility thinking about your fun weekend plans when you encounter an unknown plumber with an open ceiling tile and obvious water leak. The boiler supplying radiant heating overheated leading to a catastrophic failure of rubber pipe fittings. Those rubber fittings are all that prevent boiling water from flooding through the ceiling. Half of your facility is without heat. And worse yet, the next predicted area to flood is your NICU and birthing center. What does the first 24 hours look like to collaborate to keep patients safe? If time permits, I would also cover the IP role in next 4 months look like as this project winds through an entire building replacing all of the rubber fittings